Used Self Erect Cranes Oregon - The tower crane's base is usually bolted to a big concrete pad which provides really necessary support. The base is attached to a tower or a mast and stabilizes the crane which is attached to the inside of the building's structure. Often, this attachment point is to a concrete lift or to an elevator shaft.
The mast of the crane is often a triangulated lattice structure which measures 0.9m2 or 10 feet square. Attached to the very top of the mast is the slewing unit. The slewing unit consists of a gear and a motor which allows the crane to rotate.
Tower cranes are able to have a maximum unsupported height of eighty meters or 265 feet. The tower crane's maximum lifting capacity is 16,642 kilograms or 39,690 pounds with counter weights of twenty tons. Furthermore, two limit switches are utilized to be able to ensure the driver does not overload the crane. There is even one more safety feature called a load moment switch to ensure that the operator does not exceed the ton meter load rating. Finally, the maximum reach of a tower crane is seventy meters or 230 feet.
There is definitely a science involved with erecting a tower crane, specially because of their extreme heights. First, the stationary structure has to be brought to the construction location by utilizing a large tractor-trailer rig setup. Next, a mobile crane is utilized in order to assemble the machine portion of the crane and the jib. These sections are then attached to the mast. Then, the mobile crane adds counterweights. Crawler cranes and forklifts may be some of the other industrial equipment that is used to erect a crane.
Mast extensions are added to the crane as the building is erected. This is how the height of the crane could match the building's height. The crane crew utilizes what is called a climbing frame or a top climber that fits between the top of the mast and the slewing unit. A weight is hung on the jib by the work crew in order to balance the counterweight. Once complete, the slewing unit could detach from the top of the mast. In the top climber, hydraulic rams are utilized to adjust the slewing unit up an extra 6.1m or twenty feet. Then, the crane operator utilizes the crane to insert and bolt into place another mast section piece.
Self Erect Cranes PDF